Home / Permits by State / Utah

Permits by state

Utah Oversize Permits, Pilot Cars & Travel Restrictions

What UDOT Motor Carrier Division requires before an oversize or overweight load moves in Utah: legal limits, permits and fees, pilot and police escorts, curfews and holidays. Sourced from UDOT, Utah Code and Utah Administrative Rule R909-2.

This is a summary, not legal advice, and permit rules change. Items marked verify with the state could not be confirmed from an official source. Confirm current conditions with the issuing agency, or let us handle it: every load we book is permitted and routed for you.

The numbers

Utah legal limits (no permit)

DimensionLegal limit
Width8 ft 6 in
Height14 ft
LengthSingle unit 45 ft; other combinations per R909-2-4
Gross weight80,000 lb (overweight permit above)

Sources: UDOT: Legal Height, Width & Length; UDOT: Oversize & Overweight Provisions. Checked Oct 15, 2026.

Permits

UDOT permits and fees

Get the permit before entering Utah (except entries via the St. George, Echo and Wendover ports). Paper or electronic permits are accepted. Published statutory fees:

PermitFee
Single trip oversize (96 hours)$30
Semiannual oversize$75
Annual oversize$90
Single trip oversize and overweight (96 hours)$60

Superloads: loads over 17 ft 6 in high, 17 ft wide, or 300,000 lb are processed only 8 AM-5 PM MT Mon-Fri and may take up to 14 days. Loads over 17 ft wide on secondary highways, 20 ft on freeways, 17 ft 6 in high or 175 ft long need regional authorization (allow up to 14 days); the permittee arranges utility clearances, pilots and any police escort (request UHP at least 48 hours ahead).

Sources: Utah Code 72-7-406 (PDF); UDOT: Oversize & Overweight Provisions; UDOT: Non-Divisible Load Provisions. Checked Oct 15, 2026.

Pilot cars

Escort requirements (R909-2-18, -19)

SituationRequirement
Over 12 ft wide on secondary highways / over 14 ft on divided interstates1 pilot
Over 105 ft long secondary / 120 ft divided1 pilot
Overhang over 20 ft1 pilot on the overhang side
Over 14 ft wide secondary / over 16 ft divided2 pilots
Over 120 ft long secondary, or over 16 ft high2 pilots
Over 17 ft wide secondary, 20 ft any highway, or 17 ft 6 in highPolice escort
Over 175 ft / 200 ft long2 / 3 police escorts

Pilot drivers must hold Utah certification or an equivalent state credential.

Source: Utah Admin. Rule R909-2 (PDF via UDOT). Checked Oct 15, 2026.

When you can roll

Curfews, nights and holidays

Rush-hour curfew: loads over 10 ft wide, 105 ft long or 14 ft 6 in high may not move Mon-Fri 6-9 AM and 3:30-6 PM MT on Wasatch Front highways (Weber, Davis, Salt Lake counties and parts of Utah County, I-15, I-80, I-84).

Night: loads over 14 ft 6 in high, 105 ft long, or over 10 ft overhang are daylight-only unless they meet R909-2-15 night provisions. The width trigger is shown as 12 ft in the current rule text and 10 ft in an older UDOT copy: verify with the state.

Holidays (Christmas, New Year's, Memorial Day, July 4, Labor Day, Thanksgiving): no travel for loads over 10 ft wide, 105 ft long or 14 ft 6 in high from 2 PM the day before until sunrise the day after. Monday holidays: restricted 2 PM to midnight Friday, travel resumes sunrise Saturday through midnight Sunday, then restricted 12:01 AM Monday to sunrise Tuesday.

Sources: Utah Admin. Rule R909-2 (PDF via UDOT); R909-2-14; R909-2-13. Checked Oct 15, 2026.

Permit office

UDOT Motor Carrier Division

Customer Service (801) 965-4892 or (866) 215-5399. Apply online through UDOT's permit system; the current portal link: verify with the state. udot.utah.gov: Oversize & Overweight Provisions

Rather not deal with it? Run your load through our permit checker, then call (310) 989-6530.

Let's move something

Moving equipment in, out of, or through Utah?

Tell me what it is and where it needs to go. I'll get back to you the same day, with CRST's asset-based network behind every quote.
Call (310) 989-6530 · Email Andrew@vectorlogisticsllc.com